-- card: 74457 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 3633 -- name: Troubleshooting 5 -- part 1 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=56 right=71 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 2 (button) -- low flags: 00 -- high flags: A003 -- rect: left=17 top=203 right=224 bottom=216 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Working with Subprojects ----- HyperTalk script ----- on mouseUp go card id 67186 end mouseUp -- part 3 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=56 right=71 bottom=463 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 4 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=3 top=14 right=37 bottom=277 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 14 -- style flags: 8960 -- line height: 18 -- part name: Contents Main Head -- part 5 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part contents for card part 1 ----- text ----- MacProject II is slowing down. -- part contents for background part 6 ----- text ----- As projects become larger, their schedules take longer to calculate. You can speed up operation somewhat by turning off AutoCalc in the Dates menu and using Calculate Now when you want to recalculate the schedule. Consider reducing the size of a large project by taking parts of it and creating subprojects. -- part contents for card part 3 ----- text ----- Costs aren’t coming out right. -- part contents for background part 7 ----- text ----- Look at the Resource Table to see the cost-accrual method for each resource. If a resource is a single person, you’ll usually want Single so that costs will be assigned to only one task for any one unit of time (day, week, or other unit of duration). If a resource is a group of people or a piece of equipment, you may want to specify Multiple so that the costs are assigned to each task that uses the resource. -- part contents for card part 4 ----- text ----- Troubleshooting -- part contents for card part 5 ----- text ----- 5 of 6